Nahr Ibrahim- Al Aazra Road
To prepare the engineering design, Traffic Engineering modeling, construction documents and Construction Supervision for the rehabilitation and improvement of the section Nahr Ibrahim – Al Aazra with an aprox. Length of 10 Km, commences on the Beirut – Tripoli highway at Nahr Ibrahim exit passing and serving the towns of: Quouale, Zeitoun and Al Aazra.
- Earth work
- New road contruction
- Binder and Wearing courses
- Widening works
- Storm water drainage works
- Road signage and markings
- Concrete structures such as retaining walls, box culverts
- Geogrid wall construction